The majority of the screens within SPM Projects have similar functionality for addition, deletion and modification of data.
When advancing through a series of screens, it is important that data changes are saved on each individual screen before progressing to the next. |
||||
Indicates a mandatory field |
||||
Standard Buttons |
||||
Will display a blank screen ready for entry of a new record. |
||||
Will delete the displayed or selected record. Sometimes used in conjunction with a tick box to indicate the selected record. |
||||
Will confirm entry of a new record, deletion of a record or modification of a record. |
||||
Will reverse record additions or modifications prior to saving a record. |
||||
When additions, modifications or deletions are made to Reference data in the ADMINISTRATION module, the refresh button will display a revised list that includes any data modifications. |
||||
Movement of Programmes or Projects |
||||
Copy Programme data to create a new Programme within the same Sub-activity or between Scenarios. |
||||
|
Copy Project data to create a new Project within the same sub-activity. |
|||
|
The original Programme or Project will be retained. |
|||
Move an existing Project to a different Programme. |
||||
|
The Project will no longer be associated with the original Programme. |
|||
|
Move a Programme between Scenarios. |
|||
Used in conjunction with either the copy button or the move button to complete the relocation process. |
||||
The clear button will cancel a copy or move action. |
||||
Display Options |
||||
|
Select the display factor from the drop down list. For screens with number values, the output can be displayed as divided by a factor of 1,000 or 1,000,000. |
|||
|
A value of 18,000 will be displayed as a value of 18 if a factor of 1,000 is selected. |
|||
Select the filter option from the drop down list. Available in Sub-activity, Programme or Project Consideration and Strategy screens to filter the impact associated with Consideration or Strategy entries. |
||||
|
The list items displayed are defined by the application Administrator within Application Settings. |
|||
|
Selection of medium will display only those considerations with an an impact of medium. |
|||
Select to auto refresh the screen when a change's made to the record. |
||||
Reporting Options |
||||
|
Only the first 200 rows are displayed in any report on-screen. |
|||
Report output is directed to a printer. |
||||
Output will be directed to a csv (comma separated values) file. |
||||
Report output is generated as a PDF file. |
||||
Report output is generated as a Microsoft Word file. |
When moving/copying a programme, the projects, costs and cost allocation information associated with the programme will be moved/copied as well.
When moving/copying a project, the project costs and cost allocation information associated with the project will be moved/copied as well.