The Information screen displays general details about the selected Project.
Information is recorded from current planning, relating to the detail of individual Projects.
Note: Provision of infrastructure often relates to specific parts of the community. The name of the Locality is recorded. This has no impact on the Cost Allocation of an individual project, it is provided to support later assessment of a Development Contribution charge.
Field |
Description |
|
---|---|---|
code |
Mandatory field that identifies the Project in conjunction with the Name field. |
|
name |
Mandatory field that identifies the Project in conjunction with the Code field. |
|
programme |
The Programme with which this Project is associated. |
|
|
Selected from a drop down list. |
|
status |
Mandatory field that identifies the planning of this project. |
|
|
Selected from a drop down box. |
|
|
Defined in the Status Reference setup within Administration module. |
|
alt. status |
Optional status. |
|
|
Selected from a drop down box. |
|
|
Defined in the Alt. Status Reference setup within Administration module. |
|
start year |
Once Project costs have been entered the first Project year will be displayed as the start year. |
|
net cost |
Total internally funded cost (recalculated when Cost Allocation Summary is completed) |
|
external funded |
Total externally funded cost (recalculated when Cost Allocation Summary is completed) |
|
total |
Once Project costs have been entered, the total Project cost will be displayed. |
|
scope |
A brief description of the Project scope. |
|
localities |
The physical location that will benefit from the Project. |
|
|
Selected from a drop down list. |
|
|
Multiple Localities can be selected. |
|
|
Defined in the Localities setup within Administration References. |
|
|
perc |
The percentage of the Project allocated to this locality. |
|
|
For multiple Localities, the percentage total must equal 100. |
|
|
When removing Localities, the percentage value entered should be 0 and not blank. |
|
comment |
A comment that considers and reports why this Project Capacity has been assigned to this Locality. |
manager |
The manager responsible for this Project. |