Field |
Description |
---|---|
included |
Whether this sub-activity is included in the DC calculation |
activity/sub-activity |
Name of the activity/sub-activity combinations |
catchments |
The selected catchment scenario of this sub-activity |
DC catchment(s) |
The calculated DC charge for the selected catchment |
DC community wide |
The calculated DC charge for community wide catchment |
DC Total |
The total DC charge of the sub-activity |
DC Adjusted |
The user defined maximum DC charged on this sub-activity |
projects included/total |
The Projects to be included included in the calculations run/the total number of Projects for this Scenario combination. |
|
Projects to be included are identified in the DC Calculations Inputs Parameters Screen. |
last calculated |
The date of the last calculation run was completed. |
The DC Schedule screen is used if there's a DC collection cap on some activities. e.g. The council can only collect $200 DC from each household for the transport sub-activity even though the calculated DC for transport sub-activity is $500.