Field |
Description |
---|---|
included |
Whether the Sub-activity is included in this calculations run. |
activity/sub-activity |
The activity/sub-activity combinations |
projects included/total |
The Projects included in the calculations/the total number of Projects for this Scenario combination. |
Collection of DC Charges
|
|
DC Charge Year |
Date defined by the DC Charge Date specified in the Global Settings screen. |
period |
Period over which the DC Charges are to be collected |
maximum |
Determines the maximum expected percentage of Development Contribution collection. |
|
Used in Cash Flow analysis calculations. |
|
|
growth rate collection steps
|
|
collection year 1,2,3,4,5 |
percentage of growth rate to be collected each year. |
|
The yearly percentages must total to 100% |
|
Used in Cash Flow analysis calculations. |
Condition of using 'growth rate collection steps' - when there is an anticipated potential of a lag in the collection of growth rate. For example, if the growth model predicts there are 120 units of growth to be collected but only 50% of it can be collected in the first year in reality, then the collection steps can be used to display this lag. Each growth rate will be fully collected over a 5 year period.